Projects
List of projects Value Engineering has completed.
-
Farm Bureau Idaho Office TI
2,000 square foot office TI build out for Farm Bureau. HVAC and plumbing design was typical of a TI buildout and included RTU design, duct layout, and plumbing fixture selection. We focus on value, constructability, and efficiency on these types of projects. Our turnaround on a small project like this is usually around a week…
-
27th and 44th Oakland
Two 50,000 SF, five-story apartment complexes in California. The project was completed in Revit and is 90% modular construction. We were hired to design both the site and factory-built portions. Care was given to connection methods to ensure constructability and reduce the number of connection points between modules. HVAC involved a mix of packaged VTACs…
-
Dodgers Stadium
This project involved multiple concession stands for the LA Dodgers. Each stand was modular built in a factory and shipped to site for quick installation and turnaround. Systems were optimized for construction in the factory as well as on site connections. HVAC was split systems and plumbing was typical of small commercial kitchens. Project Value…
-
Rush Truck Service Center
A 10,000 SF truck maintenance facility with multiple truck bays, including two hydrogen semi-truck work bays with special ventilation requirements. The HVAC design uses efficient ventilation and HVAC systems to provide a safe, comfortable workspace for employees while substantially reducing utility consumption and overall operating costs. The facility also includes a vehicle wash bay with…
-
BSU Honors College Dormitories
A 225,000 SF dormitory with 500 living units over five floors for Boise State University. HVAC consists of low-profile ducted ceiling units serving each living unit. Plumbing design included a central plant for hot water and typical multifamily fixtures. The project followed BSU’s project guidelines. Project Value $34,000,000 Project Info Location: Boise, IDType: MultifamilyYear Completed:…
